Outlaw Panel documentation
Quick Start
Deploy the validated release using the supported production sequence.
Purpose
Provide the shortest safe path from prepared Ubuntu host to healthy control plane.
Step-by-step
- Validate DNS and SSH.
- Stage the immutable release artifact.
- Run the production provisioner.
- Run finalization and restore validation.
- Verify every HTTPS endpoint.
Example
The health endpoint is `https://api.outlawpanel.com/api/v1/health`.
Best practices
- Never copy local `.env` files.
- Run the complete quality gate before release.
Troubleshooting
- Check systemd and PM2 when health fails.
- Confirm Nginx upstream ports are loopback/firewalled.